ITEMS |
WORK DESCRIPTION |
UNIT
|
QUANTITY
|
A
|
HULL PART REPAIRED |
|
|
1 |
Replace tole and structure
|
|
|
Replace steel plate by tole 14mm= 30 m2 |
kg
|
3,297
|
|
Replace steel plate of horizontal bulkhead frame 30 deformed by tole 12mm, KT 7000x8000 =56 m2 |
kg
|
5,275
|
|
Replace stiffener of bulkhead by steel profile L175x175x12=77m |
kg
|
2,539
|
|
Weld bottom plate welding seam corroded |
m
|
500
|
|
2 |
Hull part under water-line |
|
|
3 |
Hull part under water-line, rudder |
m2
|
4,527
|
4 |
Ballast tanks: 36 |
m3
|
|
5 |
Draught
|
m2
|
653
|
6 |
Main deck |
m2
|
3,514
|
7 |
Container on deck |
m2 |
150
|
Wash by high pressure water before cleaning |
m2 |
150
|
|
Cleaning at St 2.0; 60 % area
|
m2 |
90
|
|
Shop-primer one coat 60 % area
|
m2 |
90
|
|
Paint one coat 100 % area grey
|
m2 |
150
|
|
8 |
Pollards, hole for wipes |
m2
|
100
|
9 |
Mechanical equipment on deck |
m2
|
100
|
10 |
Zinc corrosion of hull, sinking part,sheet to pilot,in ballast tank |
unit |
158
|
11 |
Anchor winch, anchor and towing cables |
|
|
B |
CONVERSION PART
|
|
|
12 |
Hull (Block I): Cut and join barge as design approval using steels, profiles with certificates acceptance of ABS Class |
kg
|
407,000
|
13 |
Towing equipments on main deck
|
Unit |
2
|
14 |
Ballast system
|
|
|
1. Pipe, valve system |
|
|
|
2. Pump room and Diesel Engine towing ballast pump |
|
|
|
3. Ballast pump |
|
|
|
15 |
Electric part and generator
|
|
|